Feasibility of a second Tasmanian interconnector
In April 2016, the Australian and Tasmanian governments established this study of the feasibility of a second electricity interconnector (2IC) between Tasmania and Victoria. The study was initiated in response to energy supply challenges in Tasmania during 2015–16 caused by an extended outage of Basslink combined with low hydro water storage levels resulting from low rainfall.