Upgrades and behaviour change - Multicultural Services Centre WA

Date

When the Multicultural Services Centre of WA conducted an energy audit, air conditioning showed up as a large cost for the community services organisation. Numerous savings have been made since implementing recommendations like: adjusting thermostats to 22°C in winter, and 20°C in summer; regular cleaning of vents, ducts and skylights; task specific cooling via ceiling fans or portable fans; replacing florescent lighting with light emitting diodes (LEDs).

Energy efficiency improvements - Kith and Kin

Date

Townsville’s Kath and Kin Association provides opportunities for people with psychiatric and physical disabilities, acquired brain injuries, and people with disabilities.

Tank insulation - McLaren Vintners

Date

As the winemakers at McLaren Vintners well know, energy is used at every step of the wine making process.  Refrigeration is a big energy consumer, making insulation a crucial component in saving both money and energy. An audit found that if McLaren Vintners insulated all of its tanks (currently, 56% of 202 tanks are insulated), they could save over $45,000 a year on their annual electricity costs. The payback period on the outlay is only 4.5 years. 

Voltage power optimisation - Goulburn and Yarra Valley fruit packing

Date

When 2 Victorian fruit packing houses (Geoff Thompson’s and Montague’s) conducted energy audits, each found there was high potential for energy savings through the optimisation of voltage power. While the initial investment was between $125,000-285,000, the savings were significant ($54,000-$58,000 a year), and the payback period short – just 2.2 to 5.2 years. 

Energy audit and changing irrigation - orchards

Date

The ‘Watts in Your Business’ project conducted by Apple and Pear Australia Ltd completed energy audits of 30 packhouses and orchards Australia-wide. This fact sheet shows how changing irrigaton in orchards can cut energy use and save money.

Level 2 audit - Joe Vella Insurance Brokers

Date

The 30 staff of Joe Vella Insurance Brokers (JVIB) work out of a refurbished historic building in Cairns CBD. The assessor analysed tariffs and advised on how to stay on the current, cheaper tariff – including via installation of a solar PV system, and recommended numerous simple changes to reduce the building’s heat load and save money. JVIB immediately took action and the savings are expected to be imminent, given many of the implemented changes have a short payback time.

Energy efficient design and possible savings - Willowdale Community Centre

Date

Case study prepared by Team Catalyst showing how the design of a community centre in a retirement village in western Sydney might change if the building had been designed to comply with the 2019 version of the energy efficiency provisions in Section J of Volume 1 of the National Construction Code, rather than the 2016 version. The case study focuses on the building fabric provisions. The case study was completed in early 2018 using an early draft version of Section J 2019 and does not fully reflect the final version published in February 2019.  

Proposed building upgrades - Roselands Boarding House

Date

The Boarding House project at Roselands NSW is still in design development stage, and consists of 9 sole occupancy units and a communal lounge. Out of the 9 units, 6 are proposed to be two storey structures, with a mezzanine bedroom. The 3 remaining units and communal lounge room are proposed to be single storey structures. The project is a class 3 building under the NCC, located at Roselands, inner western Sydney which falls in NCC Climate Zone 5.

Extension of Stockland Green Hills Shopping Centre

Date

Case study prepared by Team Catalyst showing how the design of a shopping centre in Maitland, NSW, might change if the building had been designed to comply with the 2019 version of the energy efficiency provisions in Section J of Volume 1 of the National Construction Code, rather than the 2016 version.  The case study uses the Greenstar verification method (JV2) newly added to the 2019 version of Section J. The case study was completed in early 2018 using an early draft version of Section J 2019 and does not fully reflect the final version published in February 2019.