energy.gov.au

energy-theme-default

Proposed building upgrades - Roselands Boarding House

Publisher

Department of the Environment and Energy

Date

Type

The Boarding House project at Roselands NSW is still in design development stage, and consists of 9 sole occupancy units and a communal lounge. Out of the 9 units, 6 are proposed to be two storey structures, with a mezzanine bedroom. The 3 remaining units and communal lounge room are proposed to be single storey structures. The project is a class 3 building under the NCC, located at Roselands, inner western Sydney which falls in NCC Climate Zone 5.

Team Catalyst show how the design of a boarding house in Sydney might change if the building had been designed to comply with the 2019 version of the energy efficiency provisions in Section J of Volume 1 of the National Construction Code, rather than the 2016 version. The case study focuses on the building fabric provisions. The case study was completed in early 2018 using an early draft version of Section J 2019 and does not fully reflect the final version published in February 2019.