Energy Ministers agreed on the Trajectory for Low Energy Buildings in 2019. This is a national plan that aims to achieve:

  • zero energy and carbon ready buildings in Australia
  • the National Energy Productivity Plan target of improving energy productivity by 40% by 2030

The report identifies 6 options to achieve this.

The report is by the former Department of the Environment and Energy and the COAG Energy Council.

Timing peak energy use - P. Savio & Co. pack house and cold storage

Date

An assessment of P. Savio & Co. (Savios) pack house and cold storage showed where energy use and costs could be reduced. Savios facility in Pozieres Queensland produces and packs approximately 4000 tonnes of apples per annum. It is a large facility with 14 cold storage rooms controlled by a refrigeration system that utilises 3 large ammonia compressors ranging from 22 kilowatt (kW) to 37kW in size. From May 2013 to February 2014 the pack house consumed just over 435,000 kilowatt hours (kWh) of electricity at a cost of almost $95,000 (excluding GST).

A guide to improve energy efficiency at your YMCA Aquatic Centre

Date

Aquatic Centres use an enormous amount of energy. But with efficiency measures, YMCA Spark pilot site Peter Krenz Aquatic Centre managed to cut electricity use by 8.5% and identified opportunities to save a further 20%. This Aquatic Centre found that by being more energy efficient and making some smart energy investments, they could have a reduction off their energy bills of at least $30,000 per year.

Energy efficient design and possible savings - Willowdale Community Centre

Date

Case study prepared by Team Catalyst showing how the design of a community centre in a retirement village in western Sydney might change if the building had been designed to comply with the 2019 version of the energy efficiency provisions in Section J of Volume 1 of the National Construction Code, rather than the 2016 version. The case study focuses on the building fabric provisions. The case study was completed in early 2018 using an early draft version of Section J 2019 and does not fully reflect the final version published in February 2019.  

Proposed building upgrades - Roselands Boarding House

Date

The Boarding House project at Roselands New South Wales is still in design development stage, and consists of 9 sole occupancy units and a communal lounge. Out of the 9 units, 6 are proposed to be two storey structures, with a mezzanine bedroom. The 3 remaining units and communal lounge room are proposed to be single storey structures. The project is a class 3 building under the NCC, located at Roselands, inner western Sydney which falls in NCC Climate Zone 5.

Potential energy savings - Stockland Green Hills Shopping Centre

Date

This case study prepared by Team Catalyst showing how the design of a shopping centre in Maitland New South Wales might change if the building had been designed to comply with the 2019 version of the energy efficiency provisions in Section J of Volume 1 of the National Construction Code, rather than the 2016 version. The case study uses the Greenstar verification method (JV2) newly added to the 2019 version of Section J. The case study was completed in early 2018 using an early draft version of Section J 2019 and does not fully reflect the final version published in February 2019.

Energy assessment leads to energy savings - Central Kitchens

Date

When an energy assessment clearly showed the owners of Victoria’s Central Kitchens where its energy was going, the company set about reducing its costs by: upgrading to an energy efficient air compressor; introducing better start-up and shut-down procedures; replacing halogen lights with compact flurorescent lamps (CFLs) and light emitting diodes (LEDs), installing timer buttons in toilets; fitting timers and exhaust fans to the drink machines and installing CFLs to its high bay. 

Energy assessment and equipment upgrades reduces energy use - Majors SUPA IGA

Date

Major’s SUPA IGA has served its community for more than 100 years.  The owners have implemented numerous energy efficiency measures including airlocking the store entrance - creating a thermal barrier, by installing a second door, reduces air exchange between external and internal areas of the store, and cuts the heating, cooling and refrigeration load. Upgrading the heating and cooling system - installing variable speed drives to the heat pump and upgrading the cooling tower to a compressed condenser with high efficiency fans to reduce energy input to energy output requirements and increas

Energy efficiency assessment - Bendigo Access Employment

Date

 As a result of the recommendations from an energy assessment, Bendigo Access Employment has been reducing energy use across all sites. Measures implemented have included:

  • turning off PAs/amplifiers/data projectors located in class rooms, training rooms and meeting rooms when not in use
  • increasing the ICT server room temperature from 16 to 18°C
  • removing staff personal heaters