Level 2 audit - Cairns Hardware

Date

A Level 2 energy audit at Cairns Hardware found tens of thousands of dollars in potential annual energy savings. $5500 a year would be saved simply by changing to a more appropriate energy tariff;.$12,000 a year could be saved by replacing lighting on the company’s 3 sites with light emitting diodes (LEDs). Even air conditioning bills could be reduced, either via stronger air-curtains or automatic doors (a potential saving of $11,500 per annum).  The company acted quickly, and has already begun making savings.

Using sustainable products and equipment upgrades - Cantilever Interiors

Date

Cantilever Interiors, a Victorian firm of furniture designers and makers, has long had an environmentally-focussed product offering. Customer demand drove the change to using ‘greener’ product made with sustainable materials in their furniture. In their own premises metal halide lamps and light emitting diodes (LEDs) lighting were installed, they are more efficient than incandescent globes and have a longer life-span, reducing landfill. New insulation was installed, nullifying any need for heating and cooling. A new more efficient air compressor was installed.

Implementing energy efficiency and sustainability measures - Cafe Lua

Date

At Carlton’s Café Lua, a local program helped inspire a range of sustainability improvements. These include switching to compostable take away cups, installing water-saving tap aerators, installing energy-efficient lighting and installing louvre windows for ventilation – a move which reduces the need for energy intensive air conditioning.

Green light cafe - Cafe Koula

Date

At Northcote’s Café Koula, changing the lighting has led to changing the atmosphere in the busy café. Compact fluorescents replaced 105 watt metal halides, giving an equivalent light while using less energy, and improving light in the café’s work areas. A produce garden is popular with families, and waste is fed to local chickens or  in a retrofitted worm farm. Financially, the business has saved $140 a year electricity and maintenance costs, while reducing its greenhouse emissions.

Low cost sustainable solutions - Breathe Architecture

Date

At sustainable architecture practice Breathe Architecture, the company applies the principles it uses to help clients create buildings with lighter footprints to its own office. Insulation, fans and smart design of window placement draw cool air in and push hot air out, negating the need for air conditioning.  Amongst other things: second-hand furniture and fittings save money and carbon emissions, and staff are given a sustainability induction to discuss these and other measures in place.

Energy efficient design and possible savings - Willowdale Community Centre

Date

Case study prepared by Team Catalyst showing how the design of a community centre in a retirement village in western Sydney might change if the building had been designed to comply with the 2019 version of the energy efficiency provisions in Section J of Volume 1 of the National Construction Code, rather than the 2016 version. The case study focuses on the building fabric provisions. The case study was completed in early 2018 using an early draft version of Section J 2019 and does not fully reflect the final version published in February 2019.  

Proposed building upgrades - Roselands Boarding House

Date

The Boarding House project at Roselands New South Wales is still in design development stage, and consists of 9 sole occupancy units and a communal lounge. Out of the 9 units, 6 are proposed to be two storey structures, with a mezzanine bedroom. The 3 remaining units and communal lounge room are proposed to be single storey structures. The project is a class 3 building under the NCC, located at Roselands, inner western Sydney which falls in NCC Climate Zone 5.

Potential energy savings - Stockland Green Hills Shopping Centre

Date

This case study prepared by Team Catalyst showing how the design of a shopping centre in Maitland New South Wales might change if the building had been designed to comply with the 2019 version of the energy efficiency provisions in Section J of Volume 1 of the National Construction Code, rather than the 2016 version. The case study uses the Greenstar verification method (JV2) newly added to the 2019 version of Section J. The case study was completed in early 2018 using an early draft version of Section J 2019 and does not fully reflect the final version published in February 2019.

Greening the Arts - Arts Project Australia

Date

The not-for-profit organisation, Arts Project Australia, provides an inner city studio and gallery to nurture and promote artists with an intellectual disability. Owning the building makes environment actions even more compelling, so when an audit helped clarify priorities, the organisation got started. It installed double-glazed and operable windows, replaced halogens with light emitting diodes (LEDs), and switched power companies. Their first bill after the changes was $1200 less than usual.

Energy and water efficiency and waste reduction - Alto Hotel

Date

When the Alto Hotel was built in 2006, sustainability features were built into the design. Today, the hotel achieves outstanding savings in energy, waste and water use. While these features added approximately $450,000 to the $5 million build, savings on electricity, water, gas and chemicals are estimated at $50,000 per annum, and creates a point of different for customers.